BEHSHAHR-2 63/20 kV Substation Automation & Protection System


Enduser:

Mazandaran Regional Electric Company

Progress Percentage:

100%

Ray Avin Fan Services:

Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning

Project Description:

BEHSHAR-2 63/20 kV substation includes two 63kV lines, two 63/20 kV transformers, ten 20kV outgoing feeders.
Zohreh Talebi, [25.11.15 21:23] Automation system of this substation is GE-NESIS of GE Spain and main Relays and Bay Control Units (BUCs) have been supplied from GE Spain and Canada as well. Automatic Voltage Regulators of Power Transformers (AVRs) have been supplied from a-eberle of Germany.
The Automation System is fully redundant and based on Hot and Standby server Scheme. This substation will communicate with Scada Centers via IEC 60870-5-101.
All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Supervision on SAS and Protection system installation have been done by RAY Avin FAN.


The main Ray Avin FAN activities in brief:

  • • Procurement of all Protective Relays, Bay Control Units, Automation system software
  • • Procurement of Ethernet Switches
  • • Procurement of Protection and Control panels
  • • Basic design for substation Protection.
  • • Basic design for substation Control.
  • • Basic design for SAS Communication scheme and Numerical Control.
  • • Detail design for substation control.
  • • Detail design for substation protection.
  • • BCU & Protection Relay Configuration.
  • • Data Base generation for Numerical control system.
  • • Picture generation for Numerical control System.
  • • Logic & Interlocking generation in BCUs.
  • • Factory acceptance test (FAT)
  • • Site acceptance test (SAT) and commissioning.
  • • Substation energizing handling & system delivery.

Advanced Consultation for Substation Automation System


Client:
Tehran Regional Electric Company

Progress Percentage:

100%

Ray Avin Fan Services:

Consultation

Project Description:

Advanced consultancy for substation automation system of ten 63/20 kV substations in the Tehran province of Iran. Evaluation of SAS technologies, possibility studies, architecture studies, communication with SCADA centers and their protocols studies were in the scope of work.


GONBAD-3 63/20 kV Substation Automation & Protection system


Enduser:

Mazandaran Regional Electric Company

Progress Percentage:

100%

Ray Avin Fan Services:

Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning

Project Description:

GONBAD-3 63/20 kV substation includes two 63kV lines, two 63/20 kV transformers, ten 20kV outgoing feeders.
Automation system of this substation is GE-NESIS of GE Spain and main Relays and Bay Control Units (BUCs) have been supplied from GE Spain and Canada as well. Automatic Voltage Regulators of Power Transformers (AVRs) have been supplied from a-eberle of Germany.
The Automation System is fully redundant and based on Hot and Standby server Scheme. This substation will communicate with Scada Centers via IEC 60870-5-101.
All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Supervision on SAS and Protection system installation have been done by RAY Avin FAN.


The main Ray Avin FAN activities in brief:

  • • Procurement of all Protective Relays, Bay Control Units, Automation system software
  • • Procurement of Ethernet Switches
  • • Procurement of Protection and Control panels
  • • Basic design for substation Protection.
  • • Basic design for substation Control.
  • • Basic design for SAS Communication scheme and Numerical Control.
  • • Detail design for substation control.
  • • Detail design for substation protection.
  • • BCU & Protection Relay Configuration.
  • • Data Base generation for Numerical control system.
  • • Picture generation for Numerical control System.
  • • Logic & Interlocking generation in BCUs.
  • • Factory acceptance test (FAT)
  • • Site acceptance test (SAT) and commissioning.
  • • Substation energizing handling & system delivery.

SARBANDAR 230/132/33 kV Substation Automation & Protection system


Enduser:

Khuzestan Regional Electric Company

Progress Percentage:

75%

Ray Avin Fan Services:

Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning

Project Description:

SARBANDAR 230/132/33 kV substation includes two 230kV lines, two 230/132 kV power transformers, two 230/33 kV power transformers, Eight 132kV lines and 14no. 33kV outgoing feeders.
Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from RuggedCom of Canada and GPS are supplied from form HOPF of Germany.
The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and HDLC (HITACHI) protocols.
All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.


The main Ray Avin FAN activities in brief:

  • • Procurement of all Protective Relays, Bay Control Units, Automation system software
  • • Procurement of Industrial Ethernet Switches
  • • Procurement of Fiber optic cables and accessories
  • • Basic design for substation Protection.
  • • Basic design for substation Control.
  • • Basic design for SAS Communication scheme and Numerical Control.
  • • Detail design for substation control.
  • • Detail design for substation protection.
  • • BCU & Protection Relay Configuration.
  • • Data Base generation for Numerical control system.
  • • Picture generation for Numerical control System.
  • • Logic & Interlocking generation in BCUs.
  • • Pre-FAT in Germany.
  • • Factory acceptance test (FAT) in Iran after panel manufacturing
  • • Fiber Optic cabling and splicing
  • • Site acceptance test (SAT) and commissioning.
  • • SCADA connection engineering and remote telecommunications.
  • • Substation energizing handling & system delivery.

YASOUJ 400/132/20 kV Substation Automation & Protection System


Enduser:

Iran Power Development Company (IPDC)

Progress Percentage:

95%

Ray Avin Fan Services:

Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning

Project Description:

Yasouj 400/132/20 kV substation includes two 400kV lines, two 400/132/20 kV power transformers, Six 132kV lines.
Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from RuggedCom of Canada and GPS are supplied from form HOPF of Germany.
The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and HDLC (HITACHI) protocols.
All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.


The main Ray Avin FAN activities in brief:

  • • Procurement of all Protective Relays, Bay Control Units, Automation system software
  • • Procurement of Industrial Ethernet Switches
  • • Procurement of Fiber optic cables and accessories
  • • Basic design substation Protection.
  • • Basic design substation Control.
  • • Basic design SAS Communication scheme and Numerical Control.
  • • Detail design for substation control.
  • • Detail design for substation protection.
  • • BCU & Protection Relay Configuration.
  • • Data Base generation for Numerical control system.
  • • Picture generation for Numerical control System.
  • • Logic & Interlocking generation in BCUs.
  • • Pre-FAT in Germany.
  • • Factory acceptance test (FAT) in Iran after panel manufacturing
  • • Fiber Optic cabling and splicing
  • • Site acceptance test (SAT) and commissioning.
  • • SCADA connection engineering and remote telecommunications.
  • • Substation energizing handling & system delivery.

Electrical Bulk Material for Jahan Vegeterian Edible Oil Complex


Enduser:

Jahan Vegeterian Edible Oil Complex

Progress Percentage:

100%

Ray Avin Fan Services:

Procurement

Project Description:

Procurement of Electrical Bulk Material for CMB S.p.a of Italy.


SARI 230/63 kV Substation Automation & Protection System


Enduser:

Iran Power Development Company (IPDC)

Progress Percentage:

100%

Ray Avin Fan Services:

Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning

Project Description:

Sari 230/63 kV substation includes two 230kV lines, 2 230/63/20 kV power transformers, Eight 63kV lines.
Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from RuggedCom of Canada and GPS are supplied from form HOPF of Germany.
The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and Indactic 2033 protocols.
All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.


The main Ray Avin FAN activities in brief:

  • • Procurement of all Protective Relays, Bay Control Units, Automation system software
  • • Procurement of Industrial Ethernet Switches
  • • Procurement of Fiber optic cables and accessories
  • • Basic design for substation Protection.
  • • Basic design for substation Control.
  • • Basic design for SAS Communication scheme and Numerical Control.
  • • Detail design for substation control.
  • • Detail design for substation protection.
  • • BCU & Protection Relay Configuration.
  • • Data Base generation for Numerical control system.
  • • Picture generation for Numerical control System.
  • • Logic & Interlocking generation in BCUs.
  • • Pre-FAT in Germany.
  • • Factory acceptance test (FAT) in Iran after panel manufacturing
  • • Fiber Optic cabling and splicing
  • • Site acceptance test (SAT) and commissioning.
  • • SCADA connection engineering and remote telecommunications.
  • • Substation energizing handling & system delivery.

CHENAR SHAHIJAN 400 kV Substation Extension Protective Relays


Enduser:

Iran Power Development Company (IPDC)

Progress Percentage:

100%

Ray Avin Fan Services:

Procurement

Project Description:

Chenar Shahijan 400 kV substation Extension includes Two 400kV lines.
Protective relays are supplied from Siemens.

The main Ray Avin FAN activities in brief:

  • Procurement of all Protective Relays.

Power Management System (PMS) and Process monitoring of Kermanshah Sewage Treatment Facilities


Enduser:

Kermanshah Water and Sewage Water Company

Progress Percentage:

100%

Ray Avin Fan Services:

Engineering
Procurement
Factory Acceptance Test
Site Acceptance and Commissioning

Project Description:


The main Ray Avin FAN activities in brief:

  • • Procurement of PLC equipment based on Siemens S7 product series
  • • Procurement of Control system software
  • • Procurement of Panels
  • • Engineering of Power management system
  • • Engineering of Pump station and Sewage water treatment process
  • • Factory Acceptance test
  • • Site Acceptance test and Commissioning

Yazd Mobile 132-63/20 kV Substation Automation & Protection System


Enduser:

Yazd Regional Electric Company

Progress Percentage:

100%

Ray Avin Fan Services:

Engineering
Factory Acceptance Test
Site Acceptance and Commissioning

Project Description:

Yazd Mobile 132-63/20 kV substation has been design for connection to two different voltage levels, 132 kV and 63 kV. The Power transformer of substation has an off-load tap changer in the Primary side of transformers which it creates the capability of connection of substation to mentioned voltage levels. The incomings and outgoings breaker of 20 kV section are Pole mounted Recloser from Wipp & Bourne Co. of England. This substation includes one 132 (63) kV line, one 132 (63)/20 kV Power transformer and four 20 kV outgoing.
Automation system of this substation is GE-NESIS of GE Spain and main Relays and Bay Control Units (BUCs) have been supplied from GE Spain and Canada as well. Automatic Voltage Regulators of Power Transformers (AVR) have been supplied from a-eberle of Germany.
The Automation System is single.
All Design, Factory Acceptance test (SAT), Site acceptance test (SAT), Supervision on SAS and Protection system installation have been done by RAY Avin FAN.


The main Ray Avin FAN activities in brief:

  • • Basic design for substation Protection.
  • • Basic design for substation Control.
  • • Basic design for SAS Communication scheme and Numerical Control.
  • • Detail design for substation control.
  • • Detail design for substation protection.
  • • BCU & Protection Relay Configuration.
  • • Data Base generation for Numerical control system.
  • • Picture generation for Numerical control System.
  • • Logic & Interlocking generation in BCUs.
  • • Factory acceptance test (FAT)
  • • Site acceptance test (SAT) and commissioning.
  • • Substation energizing handling & system delivery.

RUDESHUR 400 kV Power Plant Substation Automation System


Enduser:

SIEMENS Power Generation

Progress Percentage:

100%

Ray Avin Fan Services:

Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning

Project Description:

RUDESHUR 400 kV Power Plant substation is a BOT (Buy Operation Transfer) and is a private Power Plant. Phase one of the project is included 3 Power Plant Feeder, 2 over head line feeders.
Automation system of this substation is TG820L of Siemens Switzerland.
The Automation section including all related engineering activities and commissioning like Hardware test, Software test, logic, GPS settings and Tele Communication test have been done by Ray Avin Fan.

The main activities in this project are as following:

  • • Procurement of HOST computers.
  • • Programming, Picture generation, logic & data base generation for TG820L (Siemens Switzerland).
  • • Review of Basic documents for substation Protection.
  • • Review of Basic documents for substation Control.
  • • Review of Basic documents for SAS Communication scheme and Numerical Control.
  • • Review of Detail design for substation control.
  • • Review of Detail design for substation protection.
  • • Logic & Interlocking generation in BCUs.
  • • Factory acceptance test (FAT)
  • • Site acceptance test (SAT) and commissioning.
  • • SCADA connection engineering and remote telecommunications.
  • • Substation energizing handling & system delivery.

Ghaen 400 kV Power Plant Substation Automation & Protection system


Enduser:

Iran Power Development Company (IPDC)

Progress Percentage:

100%

Ray Avin Fan Services:

Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning

Project Description:

All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.

Ghaen 400 kV Power Plant substation located in south of Khorasan Province. This substation includes four generator feeders, six over head lines. Automation system of this substation is TG820L of Siemens Switzerland, Bay Control Units (BUCs) are from Siemens Switzerland and main Relays are supplied from Siemens Germany. This substation will communicate with Scada Centers via IEC 60870-5-101.
All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation


The main Ray Avin FAN activities in brief:

  • • Procurement of all Protective Relays, Bay Control Units, Automation system software
  • • Procurement of Protection and Control panels.
  • • Procurement of Fiber optic cables and accessories
  • • Basic design for substation Protection.
  • • Basic design for substation Control.
  • • Basic documents for SAS Communication scheme and Numerical Control.
  • • Detail design for substation control.
  • • Detail design for substation protection.
  • • BCU & Protection Relay Configuration.
  • • Data Base generation for Numerical control system.
  • • Picture generation for Numerical control System.
  • • Logic & Interlocking generation in BCUs.
  • • Pre-FAT in Switzerland.
  • • Factory acceptance test (FAT) in Iran after panel manufacturing
  • • Fiber Optic cabling and splicing
  • • Site acceptance test (SAT) and commissioning.
  • • SCADA connection engineering and remote telecommunications.
  • • Substation energizing handling & system delivery.

ESFAHAN STEEL (ZOBEAHAN) 63/10.5 kV Substation Automation & Protection System


Enduser:

Esfahan Steel Co.

Progress Percentage:

95%

Ray Avin Fan Services:

Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning

Project Description:

Esfahan Steel 63/10.5 kV substation includes two 63/10.5 kV Power transformers, four 10.5 kV incomings and 26 no. 10.5 kV Outgoings.
Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from RuggedCom of Canada and GPS are supplied from form HOPF of Germany.
The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 protocol.
All Design, partial Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.


The main Ray Avin FAN activities in brief:

  • • Procurement of all Protection and Control panels.
  • • Procurement of Industrial Computers.
  • • Procurement of Fiber optic cables and accessories
  • • Basic design for substation Protection.
  • • Basic design for substation Control.
  • • Basic design for SAS Communication scheme and Numerical Control.
  • • Detail design for substation control.
  • • Detail design for substation protection.
  • • BCU & Protection Relay Configuration.
  • • Data Base generation for Numerical control system.
  • • Picture generation for Numerical control System.
  • • Logic & Interlocking generation in BCUs.
  • • Pre-FAT in Germany.
  • • Factory acceptance test (FAT) in Iran after panel manufacturing
  • • Fiber Optic cabling and splicing
  • • Site acceptance test (SAT) and commissioning.
  • • SCADA connection engineering and remote telecommunications.
  • • Substation energizing handling & system delivery.

KABUL NORTH (AFGHANISTAN) 110/20 kV Substation Automation & Protection System


Enduser:

Islamic Republic of Afghanistan, Ministry of Energy

Progress Percentage:

80%

Ray Avin Fan Services:

Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning

Project Description:

North Kabul 110/20 kV substation includes four 110 kV Lines, two 110/20 kV Power transformers and 14no. 20 kV Outgoings.
Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from RuggedCom of Canada and GPS are supplied from form HOPF of Germany.
The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 protocol.
All Design, partial Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.


The main Ray Avin FAN activities in brief:

  • • Procurement of all Protection and Control panels.
  • • Procurement of Industrial Computers.
  • • Procurement of Fiber optic cables and accessories
  • • Basic design for substation Protection.
  • • Basic design for substation Control.
  • • Basic design for SAS Communication scheme and Numerical Control.
  • • Detail design for substation control.
  • • Detail design for substation protection.
  • • BCU & Protection Relay Configuration.
  • • Data Base generation for Numerical control system.
  • • Picture generation for Numerical control System.
  • • Logic & Interlocking generation in BCUs.
  • • Pre-FAT in Germany.
  • • Factory acceptance test (FAT) in Iran after panel manufacturing
  • • Fiber Optic cabling and splicing
  • • Site acceptance test (SAT) and commissioning.
  • • SCADA connection engineering and remote telecommunications.
  • • Substation energizing handling & system delivery.

ESFAHAN STEEL (ZOBEAHAN) 230/63 kV Substation Automation & Protection System


Enduser:

Esfahan Steel Co.

Progress Percentage:

80%

Ray Avin Fan Services:

Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning

Project Description:

Esfahan Steel 63 kV substation (63 kV voltage level is in the scope of work) includes 20 no. 63 kV feeders.
Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Industrial Ethernet switched are supplied from RuggedCom of Canada and GPS are supplied from form HOPF of Germany.
The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 protocol.
All Design, partial Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.


The main Ray Avin FAN activities in brief:

  • • Procurement of all Protection and Control panels.
  • • Procurement of Industrial Computers.
  • • Procurement of Fiber optic cables and accessories
  • • Basic design for substation Protection.
  • • Basic design for substation Control.
  • • Basic design for SAS Communication scheme and Numerical Control.
  • • Detail design for substation control.
  • • Detail design for substation protection.
  • • BCU & Protection Relay Configuration.
  • • Data Base generation for Numerical control system.
  • • Picture generation for Numerical control System.
  • • Logic & Interlocking generation in BCUs.
  • • Pre-FAT in Germany.
  • • Factory acceptance test (FAT) in Iran after panel manufacturing
  • • Fiber Optic cabling and splicing
  • • Site acceptance test (SAT) and commissioning.
  • • SCADA connection engineering and remote telecommunications.
  • • Substation energizing handling & system delivery.

MIYANEH 400/230/60/20 kV Substation Automation & Protection System


Enduser:

Azarbayejan Regional Electric Co.

Progress Percentage:

50%

Ray Avin Fan Services:

Engineering
Procurement
Factory Acceptance Test
Supervision on Installation
Site Acceptance and Commissioning

Project Description:

Miyaneh 400/230/60/20 kV substation includes three 400kV lines, one 400/230 kV power transformer, one 400/230 kV power transformer, four 230kV lines and four 63kV lines.
Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from RuggedCom of Canada and GPS are supplied from form HOPF of Germany.
The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and HDLC (HITACHI) protocols.
All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.


The main Ray Avin FAN activities in brief:

  • • Procurement of all Protective Relays, Bay Control Units, Automation system software
  • • Procurement of Industrial Ethernet Switches
  • • Procurement of Fiber optic cables and accessories
  • • Basic design substation Protection.
  • • Basic design substation Control.
  • • Basic design SAS Communication scheme and Numerical Control.
  • • Detail design for substation control.
  • • Detail design for substation protection.
  • • BCU & Protection Relay Configuration.
  • • Data Base generation for Numerical control system.
  • • Picture generation for Numerical control System.
  • • Logic & Interlocking generation in BCUs.
  • • Pre-FAT in Germany.
  • • Factory acceptance test (FAT) in Iran after panel manufacturing
  • • Fiber Optic cabling and splicing
  • • Site acceptance test (SAT) and commissioning.
  • • SCADA connection engineering and remote telecommunications.
  • • Substation energizing handling & system delivery.

    29- SIHBISHE 400 kV Power Plant GIS Substation Automation & Protection system

    Enduser:

    Tehran Regional Electric Company

    Progress Percentage:

    5%

    Ray Avin Fan Services:


    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning

    Project Description:


    SIHBISHE 400 kV substation includes three 400kV lines and three 400 kV power plant feeder.
    Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Industrial Ethernet switched are supplied from Hirschmann of Germany and GPS are supplied from form HOPF of Germany.
    The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and Inductic2033 protocols.
    All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.
    The main Ray Avin FAN activities in brief:


    • • Procurement of all Protective Relays, Bay Control Units, Automation system software
    • • Procurement of Industrial Ethernet Switches
    • • Procurement of Fiber optic cables and accessories
    • • Basic design for substation Protection.
    • • Basic design for substation Control.
    • • Basic design for SAS Communication scheme and Numerical Control.
    • • Detail design for substation control.
    • • Detail design for substation protection.
    • • BCU & Protection Relay Configuration.
    • • Data Base generation for Numerical control system.
    • • Picture generation for Numerical control System.
    • • Logic & Interlocking generation in BCUs.
    • • Pre-FAT in Germany.
    • • Factory acceptance test (FAT) in Iran after panel manufacturing
    • • Fiber Optic cabling and splicing
    • • Site acceptance test (SAT) and commissioning.
    • • SCADA connection engineering and remote telecommunications.
    • • Substation energizing handling & system delivery.

    MAHDIS 230/33 kV Substation Automation & Protection System



    Enduser:

    Khuzestan Regional Electric Co.

    Progress Percentage:

    5%

    Ray Avin Fan Services:


    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning

    Project Description:


    Mahdis 230/33 kV substation includes two 230kV lines, two 230/33 kV power transformers, two33 kV capacitor feeders and fourteen 33kV outgoings.
    Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from Hirschmann of Germany and GPS are supplied from form HOPF of Germany.
    The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101, IEC 60870-5-104 and HDLC (HITACHI) protocols.
    All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.
    The main Ray Avin FAN activities in brief:

    • • Procurement of all Protective Relays, Bay Control Units, Automation system software
    • • Procurement of Industrial Ethernet Switches
    • • Procurement of Fiber optic cables and accessories
    • • Basic design substation Protection.
    • • Basic design substation Control.
    • • Basic design SAS Communication scheme and Numerical Control.
    • • Detail design for substation control.
    • • Detail design for substation protection.
    • • BCU & Protection Relay Configuration.
    • • Data Base generation for Numerical control system.
    • • Picture generation for Numerical control System.
    • • Logic & Interlocking generation in BCUs.
    • • Pre-FAT in Germany.
    • • Factory acceptance test (FAT) in Iran after panel manufacturing
    • • Fiber Optic cabling and splicing
    • • Site acceptance test (SAT) and commissioning.
    • • SCADA connection engineering and remote telecommunications.
    • • Substation energizing handling & system delivery.

    BANDAR ABBAS 230/63 kV GIS Substation Automation & Protection System


    Bandar Abbas SS

    IEC 61850


    Enduser:

    Hormozgan Regional Electric Co.

    Progress Percentage:

    15%

    Ray Avin Fan Services:

    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning

    Project Description:

    Bandar abbas 230/63 kV substation includes four 230kV lines, two 230/63kV power transformers, four 63kV lines and 63 kV cable feeders.
    Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from Hirschmann of Germany and GPS are supplied from form HOPF of Germany.
    The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and Hitachi (HDLC) protocols.
    All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.
    The main Ray Avin FAN activities in brief:


    • • Procurement of all Protective Relays, Bay Control Units, Automation system software
    • • Procurement of Industrial Ethernet Switches
    • • Procurement of Fiber optic cables and accessories
    • • Basic design for substation Protection.
    • • Basic design for substation Control.
    • • Basic design for SAS Communication scheme and Numerical Control.
    • • Detail design for substation control.
    • • Detail design for substation protection.
    • • BCU & Protection Relay Configuration.
    • • Data Base generation for Numerical control system.
    • • Picture generation for Numerical control System.
    • • Logic & Interlocking generation in BCUs.
    • • Pre-FAT in Germany.
    • • Factory acceptance test (FAT) in Iran after panel manufacturing
    • • Fiber Optic cabling and splicing
    • • Site acceptance test (SAT) and commissioning.
    • • SCADA connection engineering and remote telecommunications.

    Substation energizing handling & system delivery.

    MAYAMI 400/63 kV Substation Automation & Protection System



    Enduser:

    Semnan Regional Electric Co.

    Progress Percentage:

    10%

    Ray Avin Fan Services:


    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning

    Project Description:


    Mayami 400/63 kV substation includes two 400kV lines, two 400/63 kV power transformers and six 63kV lines.
    Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from Hirschmann of Germany and GPS are supplied from form HOPF of Germany.
    The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and HDLC (HITACHI) protocols.
    All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.
    The main Ray Avin FAN activities in brief:

    • • Procurement of all Protective Relays, Bay Control Units, Automation system software
    • • Procurement of Industrial Ethernet Switches
    • • Procurement of Fiber optic cables and accessories
    • • Basic design substation Protection.
    • • Basic design substation Control.
    • • Basic design SAS Communication scheme and Numerical Control.
    • • Detail design for substation control.
    • • Detail design for substation protection.
    • • BCU & Protection Relay Configuration.
    • • Data Base generation for Numerical control system.
    • • Picture generation for Numerical control System.
    • • Logic & Interlocking generation in BCUs.
    • • Pre-FAT in Germany.
    • • Factory acceptance test (FAT) in Iran after panel manufacturing
    • • Fiber Optic cabling and splicing
    • • Site acceptance test (SAT) and commissioning.
    • • SCADA connection engineering and remote telecommunications.
    • • Substation energizing handling & system delivery.

    Bandar Anzali Free zone 63/20 kV GIS Substation Automation & Protection System


    _

    _


    Enduser:

    Gilan Regional Electric Co.

    Progress Percentage:

    2%

    Ray Avin Fan Services:


    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning

    Project Description:


    Bandar Anzali Free zone 63/20 kV GIS substation includes two 63kV lines, two 63/20 kV power transformers, 20 no 20 kV Outgoings feeder, 4 no 20 kV Capacitor feeder and One 20 kV Bus section.
    Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from Hirschmann of Germany and GPS are supplied from form HOPF of Germany.
    The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and IEC 60870-5-104 protocols.
    All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.
    The main Ray Avin FAN activities in brief:

      • • Procurement of all Protective Relays, Bay Control Units, Automation system software
      • • Procurement of Industrial Ethernet Switches
      • • Procurement of Fiber optic cables and accessories
      • • Basic design substation Protection.
      • • Basic design substation Control.
      • • Basic design SAS Communication scheme and Numerical Control.
      • • Detail design for substation control.
      • • Detail design for substation protection.
      • • BCU & Protection Relay Configuration.
      • • Data Base generation for Numerical control system.
      • • Picture generation for Numerical control System.
      • • Logic & Interlocking generation in BCUs.
      • • Pre-FAT in Germany.
      • • Factory acceptance test (FAT) in Iran after panel manufacturing
      • • Fiber Optic cabling and splicing
      • • Site acceptance test (SAT) and commissioning.
      • • SCADA connection engineering and remote telecommunications.
      • • Substation energizing handling & system delivery.

    Mohtasham Kashani 230/63/20 kV Substation Automation & Protection System


    _

    _


    Enduser:

    Esfahan Regional Electric Co.

    Progress Percentage:

    20%

    Ray Avin Fan Services:


    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning

    Project Description:


    Mohtasham kashani 230/63/20 kV substation includes two 230kV lines, two 230/63/20 kV power transformers and 12 no 63kV Lines.
    Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from Hirschmann of Germany and GPS are supplied from form HOPF of Germany.
    The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101, Inductic2033 protocols.
    All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.
    The main Ray Avin FAN activities in brief:

      • • Procurement of all Protective Relays, Bay Control Units, Automation system software
      • • Procurement of Industrial Ethernet Switches
      • • Procurement of Fiber optic cables and accessories
      • • Basic design substation Protection.
      • • Basic design substation Control.
      • • Basic design SAS Communication scheme and Numerical Control.
      • • Detail design for substation control.
      • • Detail design for substation protection.
      • • BCU & Protection Relay Configuration.
      • • Data Base generation for Numerical control system.
      • • Picture generation for Numerical control System.
      • • Logic & Interlocking generation in BCUs.
      • • Pre-FAT in Germany.
      • • Factory acceptance test (FAT) in Iran after panel manufacturing
      • • Fiber Optic cabling and splicing
      • • Site acceptance test (SAT) and commissioning.
      • • SCADA connection engineering and remote telecommunications.
      • • Substation energizing handling & system delivery.

    Rasht-2 63/20 kV GIS Substation Automation & Protection System


    _

    _


    Enduser:

    Gilan Regional Electric Co.

    Progress Percentage:

    2%

    Ray Avin Fan Services:


    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning

    Project Description:


    Rasht-2 63/20 kV GIS substation includes two 63kV lines, two 63/20 kV power transformers, 20 no 20 kV Outgoings feeder, 4 no 20 kV Capacitor feeder and One 20 kV Bus section.
    Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from Hirschmann of Germany and GPS are supplied from form HOPF of Germany.
    The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and IEC 60870-5-104 protocols.
    All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.
    The main Ray Avin FAN activities in brief:


      • • Procurement of all Protective Relays, Bay Control Units, Automation system software
      • • Procurement of Industrial Ethernet Switches
      • • Procurement of Fiber optic cables and accessories
      • • Basic design substation Protection.
      • • Basic design substation Control.
      • • Basic design SAS Communication scheme and Numerical Control.
      • • Detail design for substation control.
      • • Detail design for substation protection.
      • • BCU & Protection Relay Configuration.
      • • Data Base generation for Numerical control system.
      • • Picture generation for Numerical control System.
      • • Logic & Interlocking generation in BCUs.
      • • Pre-FAT in Germany.
      • • Factory acceptance test (FAT) in Iran after panel manufacturing
      • • Fiber Optic cabling and splicing
      • • Site acceptance test (SAT) and commissioning.
      • • SCADA connection engineering and remote telecommunications.
      • • Substation energizing handling & system delivery.

    Paknejad 63/20 kV GIS Substation Automation & Protection System


    _

    _

    Enduser:

    Yazd Regional Electric Co.

    Progress Percentage:

    2%

    Ray Avin Fan Services:


    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning

    Project Description:


    Paknejad 63/20 kV GIS substation includes two 63kV lines, two 63/20 kV power transformers, 12 no 20 kV Outgoings feeder, 2 no 20 kV Capacitor feeder and One 20 kV Bus section.
    Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from Hirschmann of Germany and GPS are supplied from form HOPF of Germany.
    The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 and IEC 60870-5-104 protocols.
    All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.
    The main Ray Avin FAN activities in brief:

      • • Procurement of all Protective Relays, Bay Control Units, Automation system software
      • • Procurement of Industrial Ethernet Switches
      • • Procurement of Fiber optic cables and accessories
      • • Basic design substation Protection.
      • • Basic design substation Control.
      • • Basic design SAS Communication scheme and Numerical Control.
      • • Detail design for substation control.
      • • Detail design for substation protection.
      • • BCU & Protection Relay Configuration.
      • • Data Base generation for Numerical control system.
      • • Picture generation for Numerical control System.
      • • Logic & Interlocking generation in BCUs.
      • • Pre-FAT in Germany.
      • • Factory acceptance test (FAT) in Iran after panel manufacturing
      • • Fiber Optic cabling and splicing
      • • Site acceptance test (SAT) and commissioning.
      • • SCADA connection engineering and remote telecommunications.
      • • Substation energizing handling & system delivery.

    Mianeh 63/20 kV Substation Extension Automation & Protection System


    _

    _


    Enduser:

    Azarbayjan Regional Electric Co.

    Progress Percentage:

    Contract negotiation

    Ray Avin Fan Services:


    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning

    Project Description:


    Extension to Mianeh 63/20 kV substation includes one 63/20 kV power transformer, 6 no 20 kV Outgoings feeder, and One 20 kV Bus section.

    Automation system of this substation is SICAM-PAS of Siemens and main Relays and Bay Control Units (BUCs) are supplied from Siemens as well. Automatic Voltage Regulators of Power Transformers (AVRs) are supplied from a-eberle of Germany. Industrial Ethernet switched are supplied from Hirschmann of Germany and GPS are supplied from form HOPF of Germany.
    The Automation System is fully redundant and based on IEC 61850 Standard Protocol. This substation will communicate with Scada Centers via IEC 60870-5-101 protocol.
    All Design, Procurement, Factory Acceptance test (SAT), Site acceptance test (SAT), Fiber Optic Cabling, Splicing and Supervision on SAS and Protection system installation will be done by RAY Avin FAN.
    The main Ray Avin FAN activities in brief:

      • • Procurement of all Protective Relays, Bay Control Units, Automation system software
      • • Procurement of Industrial Ethernet Switches
      • • Procurement of Fiber optic cables and accessories
      • • Basic design substation Protection.
      • • Basic design substation Control.
      • • Basic design SAS Communication scheme and Numerical Control.
      • • Detail design for substation control.
      • • Detail design for substation protection.
      • • BCU & Protection Relay Configuration.
      • • Data Base generation for Numerical control system.
      • • Picture generation for Numerical control System.
      • • Logic & Interlocking generation in BCUs.
      • • Pre-FAT in Germany.
      • • Factory acceptance test (FAT) in Iran after panel manufacturing
      • • Fiber Optic cabling and splicing
      • • Site acceptance test (SAT) and commissioning.
      • • SCADA connection engineering and remote telecommunications.
      • • Substation energizing handling & system delivery.

    Eslamabad 230/63 kV Substation, Renovation of Low Impedance Busbar Protection


    EslamabadControl-img1

    Enduser:

    West Regional Electric Co.

    Progress Percentage:

    80%

    Ray Avin Fan Services:

    Engineering
    Procurement
    Factory Acceptance Test
    Supervision on Installation
    Site Acceptance and Commissioning


SHFA 63/20 kV Substation Extension Protective Relays


    _

Enduser:

Azarbayjan Regional Electric Co.

Progress Percentage:

5%

Ray Avin Fan Services:

Procurement

Project Description:


Protective relays are supplied from Siemens.

The main Ray Avin FAN activities in brief:
• Procurement of Protective Relays.

Contact us

Address: Unit 1, No.4, Zayandehroud St., North Shiraz Ave. Molasadra St., Tehran, Iran

Tel: +98-21-88612011

Fax: +98-21-88612022

website: www.rayavin.com

Email:info@rayavin.com

Quick links

History

Solutions

References

Certificates

Departments

Power

Automation

Marine

Communication

Site Map

copyright ©RayavinFan